The Off Site by Aphex
Subscribe
Sign in
The tunnel buried beneath the Baltic
Carlos Carvalho
May 1
The Fehmarnbelt Fixed Link tunnel will be buried forty metres below the surface of the Baltic Sea.
Read →
Comments
This site requires JavaScript to run correctly. Please
turn on JavaScript
or unblock scripts
The tunnel buried beneath the Baltic
The Fehmarnbelt Fixed Link tunnel will be buried forty metres below the surface of the Baltic Sea.