The 870km high-speed railway connecting the Baltics to Europe is massively over-budget — but with the Russian invasion of Ukraine, it's more important than ever.
The Rail Baltica Megaproject
The 870km high-speed railway connecting the Baltics to Europe is massively over-budget — but with the Russian invasion of Ukraine, it's more important than ever.